Tingley

Promotion of a 15-acre site to the north of Tingley for residential development, with a capacity of up to 175 dwellings.

The site is a logical location for greenbelt release being bound to the south and west by existing residential development and to the north and south by Thorpe Lane. The land is allocated as part of a larger site in the emerging Leeds Site Allocations Plan with an indicative capacity of 207 dwellings.

Stilton

A 10-acre site in Stilton for residential development, with a capacity of up to 90 houses.

Stilton sits just 3 miles south of Peterborough and has an excellent range of facilities provided within the village. The development will support a number of existing facilities in the local area, alongside proposals to incorporate both private and public amenity space, and also an area of green space to the north of the site (where a play area will be provided).

The site is located with the built-up-area of the existing village, and will include up to 90 residential properties (of which 40% will be affordable dwellings). It is envisaged that the development will comprise of a mixture of 2, 3 and 4-bedroom accommodation. Each property will include a private garden and driveway with sufficient parking provision.

500kW wind project near Stafford

A 500kW wind project near to Stafford. Constructed in December 2015, the project is accredited under the Feed in Tariff regime and will be operational for a minimum of 20 years.

Generating over 1MWh of clean energy annually, this machine is owned and operated by the Caddick Group.

15MW solar array

Located close to Uttoxeter, a large-scale field mounted solar array with 15MW of installed capacity. The scheme is accredited under ROCs and will provide enough energy to supply over 3,000 homes every year for 20 years plus.

This project was sourced, consented and sold by members of the Caddick Land team.

Selby SUE

A sustainable extension to Selby delivering up to 1,000 dwellings and a range of education, leisure and retail facilities

The site incorporates much needed housing along side a new employment park. Delivery of this will be enabled by significant infrastructure works (supported by a successful HIF application) including the implementation of a compressive flood management plan.

SOYO

Caddick has secured outline planning permission for its multi-million pound 685,000 sq ft Quarry Hill scheme.

Quarry Hill, which is adjacent to West Yorkshire Playhouse, Leeds College of Music, BBC studios, Northern Ballet Head Quarters and is opposite the new Victoria Gate scheme, looks set to be another key development in the regeneration of Leeds City Centre’s Cultural Quarter.

The proposal includes 106,000 sq ft of offices, 35,000 sq ft leisure, in excess of 700 residential units, a multi-storey car park, 7,500 sq ft retail facilities, a medical centre and a series of vibrant public squares.

20MW 6 turbine scheme

Located close to the Elan Valley in Mid-Wales, this 6 turbine scheme was consented in Summer 2016. It is yet to be constructed, but once operational will have close to 20MW of installed capacity capable of generating enough energy to power over 7,000 homes.

The project was sourced and consented by members of the Caddick Land team and once constructed will be operated by a third-party fund.

Maulden

A 10-acre site consented at appeal for a development of 49 dwellings, including 35% affordable housing.

This settlement was located in a sustainable location for development, enabling a significant project to be undertaken in a constrained local authority. Plans were highly sensitive to the landscape context of the site, preserving key views and enhancing the site’s ecological value through use of open space and the delivery of a wildlife corridor.

Leeds Valley Park

In a joint venture with Akeler Developments Limited (now Goodman), Caddick acquired the site and secured outline planning consent for this award-winning business park development.

The company completed phase 1 of the 750,000 sq.ft. scheme, together with on and off-site infrastructure. It provides high quality office accommodation three miles south of Leeds city centre.

A further 24.5 Acres remain for subsequent phases of development